![Solcon HRVS-DN series Скачать руководство пользователя страница 86](http://html1.mh-extra.com/html/solcon/hrvs-dn-series/hrvs-dn-series_instruction-manual_1314370086.webp)
86 • Packing, Storage, Handling and Assembly
_____________________________________________________________________________________________
9.4.2
Power and Control Cable Connections
Figure 26 – Power and Control Cables Penetration to the Cabinet at Level 75mm
9.4.3
Power Cables Connection
Figure 27 – Power Cables Connection and Control Cables Routing.
Note!
For low voltage test it is advised to leave motor terminals open to enable easy
connection of the low voltage motor.