![Solcon HRVS-DN series Скачать руководство пользователя страница 44](http://html1.mh-extra.com/html/solcon/hrvs-dn-series/hrvs-dn-series_instruction-manual_1314370044.webp)
44 • Installation of IP00 (OEM Kit) in a Cabinet
_____________________________________________________________________________________________
6.6
Insulation test (Option 4)
(Terminals 25, 26, 27 and Leak)
When this option is installed, resistor units RU-7 (Un
≤
7,200V) or RU13 (7,200>Un
≤
13,800V) must be installed
as shown:
Figure 17 – Optional Insulation PCB Wiring
Figure 18 – RU-7, Resistor Unit – Dimensional Drawing