Commissioning
5.3 Procedure for commissioning with STARTER
Converter cabinet units
234
Operating Instructions, 07/2016, A5E03347396A
Results of the previous steps
●
You have created a drive unit project offline using STARTER.
●
You have saved the project data to the hard disk on your PC.
●
You have transferred the project data to the drive unit.
●
You have saved your project data to your drive's memory card so that it is backed up in
the event of a power failure.
Note
Tip for working with STARTER
The STARTER commissioning tool supports complex drive system operations.
If you are confronted with any system conditions in online mode that are beyond your
control, you are advised to delete the drive project from the project navigator and carefully
create a new project in STARTER using the appropriate configuration data for your
application.
5.3.5
Commissioning with STARTER via Ethernet
Description
The Control Unit can be commissioned using a programming device (PG/PC) via the
integrated Ethernet interface. This interface is provided for commissioning purposes only and
cannot be used to control the drive in operation.
A routing of the integrated Ethernet interface via any inserted CBE20 expansion card is not
possible.
Preconditions
●
STARTER as of version 4.1.5
●
Control Unit CU320-2 DP as of device version "C", CU320-2 PN Control Unit
Содержание SINAMICS G150
Страница 1: ......
Страница 2: ......
Страница 8: ...Foreword Converter cabinet units 8 Operating Instructions 07 2016 A5E03347396A ...
Страница 18: ...Table of contents Converter cabinet units 18 Operating Instructions 07 2016 A5E03347396A ...
Страница 38: ...Device overview 2 5 Type plate Converter cabinet units 38 Operating Instructions 07 2016 A5E03347396A ...
Страница 679: ......
Страница 680: ......