Diagnosis/faults and alarms
10.2 Diagnosis
Converter cabinet units
Operating Instructions, 07/2016, A5E03347396A
601
Table 10- 10 Description of the Sync and Fault LEDs on the CBE20
LED
Color
State
Description
Fault
---
OFF
If the link port LED is green:
The CBE20 is operating normally, data is being exchanged with the con-
figured IO Controller.
Red
Flashing light
- The response monitoring time has elapsed.
- Communication has been interrupted.
- The IP address is incorrect.
- Incorrect or missing configuration.
- Incorrect parameter assignment.
- Incorrect or missing device name.
- IO controller not present/switched off but Ethernet connection present.
- Other CBE20 errors.
Continuous light CBE20 bus fault
- No physical connection to a subnet/switch.
- Incorrect transmission rate.
- Full-duplex transmission not activated.
Sync
---
OFF
If the link port LED is green:
Control Unit task system is not synchronized with the IRT clock. An inter-
nal substitute clock is generated.
Green
Flashing light
Control Unit task system has synchronized with the IRT clock and data is
being exchanged.
Continuous light Task system and MC-PLL have synchronized with the IRT clock.
Table 10- 11 Description of the OPT LED on the Control Unit
LED
Color
State
Description
OPT
---
OFF
Electronics power supply is missing or outside permissible tolerance
range.
The CBE20 is defective or not inserted.
Green
Continuous light CBE20 is ready and cyclic communication is taking place.
0.5 Hz flashing
light
CBE20 is ready but cyclic communication is not running.
Possible causes:
- Communication is being established.
-At least one fault is present.
Red
Continuous light Cyclic communication via PROFINET has not yet been established.
However, acyclic communication is possible. SINAMICS is waiting for a
parameterization/configuration telegram.
0.5 Hz flashing
light
The firmware download to the CBE20 has failed.
Possible causes:
- The memory card of the Control Unit is faulty.
- The CBE20 is out of order.
The CBE20 cannot be used in this state.
2 Hz flashing
light
Communication between the Control Unit and the CBE20 is faulty.
Possible causes:
- The CBE20 was removed following power-up.
- The CBE20 is defective.
Orange
0.5 Hz flashing
light
Firmware is being updated.
Содержание SINAMICS G150
Страница 1: ......
Страница 2: ......
Страница 8: ...Foreword Converter cabinet units 8 Operating Instructions 07 2016 A5E03347396A ...
Страница 18: ...Table of contents Converter cabinet units 18 Operating Instructions 07 2016 A5E03347396A ...
Страница 38: ...Device overview 2 5 Type plate Converter cabinet units 38 Operating Instructions 07 2016 A5E03347396A ...
Страница 679: ......
Страница 680: ......