![Siemens SINAMICS G150 Скачать руководство пользователя страница 241](http://html.mh-extra.com/html/siemens/sinamics-g150/sinamics-g150_operating-instructions-manual_378202241.webp)
Commissioning
5.5 First commissioning with the AOP30
Converter cabinet units
Operating Instructions, 07/2016, A5E03347396A
241
5.5
First commissioning with the AOP30
5.5.1
Initial ramp-up
Start screen
When the system is switched on for the first time, the Control Unit is initialized automatically.
The following screen is displayed:
Figure 5-38 Initial screen
When the system boots up, the parameter descriptions are loaded into the operating field
from the CompactFlash card.
Figure 5-39 Load the parameter descriptions while booting up the system
Содержание SINAMICS G150
Страница 1: ......
Страница 2: ......
Страница 8: ...Foreword Converter cabinet units 8 Operating Instructions 07 2016 A5E03347396A ...
Страница 18: ...Table of contents Converter cabinet units 18 Operating Instructions 07 2016 A5E03347396A ...
Страница 38: ...Device overview 2 5 Type plate Converter cabinet units 38 Operating Instructions 07 2016 A5E03347396A ...
Страница 679: ......
Страница 680: ......