Operation
6.10 Communication via SINAMICS Link
Converter cabinet units
372
Operating Instructions, 07/2016, A5E03347396A
Bus cycle and number of nodes
The bus cycle of SINAMICS Link can be operated, synchronized with the current control
cycle, or not synchronized.
●
Synchronized operation is set with p8812[0] = 1.
Up to 16 stations with 500 µs bus cycle can communicate with one another via
SINAMICS Link. To do this, the maximum number of nodes must be set with p8811 = 16.
Up to 64 stations with 1000 µs or 2000 µs bus cycle can communicate with one another
via SINAMICS Link. To do this, the maximum number of nodes must be set with
p8811 = 64.
●
In non-synchronized operation (p8812[0] = 0), the PZD sampling time (p2048/p8848) is
effective instead of the bus cycle (p8812[1]).
After changing over parameter p8811 and p8812, a POWER ON must be carried out to
accept the settings.
6.10.2
Topology
Only a line topology with the following structure is permitted for SINAMICS Link.
Figure 6-45 Maximum topology
Содержание SINAMICS G150
Страница 1: ......
Страница 2: ......
Страница 8: ...Foreword Converter cabinet units 8 Operating Instructions 07 2016 A5E03347396A ...
Страница 18: ...Table of contents Converter cabinet units 18 Operating Instructions 07 2016 A5E03347396A ...
Страница 38: ...Device overview 2 5 Type plate Converter cabinet units 38 Operating Instructions 07 2016 A5E03347396A ...
Страница 679: ......
Страница 680: ......