Safety information
2
2.1
Information for the nominated person in control of the electrical
installation
This electric machine has been designed and built in accordance with the specifications
contained in Directive 2014/35/EU ("Low-Voltage Directive") and is intended for use in
industrial plants. Please observe the country-specific regulations when using the electric
machine outside the European Community. Follow the local and industry-specific safety and
setup regulations.
The persons responsible for the plant must ensure the following:
● Planning and configuration work and all work carried out on and with the machine is only
to be done by qualified personnel.
● The operating instructions must always be available for all work.
● The technical data as well as the specifications relating to the permissible installation,
connection, ambient and operating conditions are taken into account at all times.
● The specific setup and safety regulations as well as regulations on the use of personal
protective equipment are observed.
Note
Use the services and support provided by the appropriate Service Center (Page 177) for
planning, installation, commissioning, and servicing work.
You will find safety instructions in the individual sections of this document. Follow the safety
instructions for your own safety, to protect other people and to avoid damage to property.
Observe the following safety instructions for all activities on and with the machine.
This machine has been designed and built in accordance with Directive 2014/34/EU
("Explosion Protection Directive") and is intended for use in industrial plants with potentially
explosive atmosphere.
Commissioning in the European Community in accordance with Directive 2006/42/EU
(“Machinery Directive”) is forbidden until the plant into which the machine will be installed has
been shown to conform with this directive. Please observe the country-specific regulations
when using the machine outside the European Community.
WARNING
Risk of explosion with commissioning prior to determining the conformity
If the machine is commissioned prior to determining the plant conformance, the explosion
protection of the plant is not ensured. An explosion can occur. This can result in death, serious
injury or material damage.
Do not commission the machine until it has been confirmed that the plant conforms with the
explosion protection directive.
SIMOTICS FD 1MH1
Operating Instructions 08/2017
15
Содержание SIMOTICS FD 1LL1
Страница 2: ...18 08 2017 17 24 V10 00 ...
Страница 32: ...Description 3 1 Comparison of IEC and GOST standards SIMOTICS FD 1MH1 32 Operating Instructions 08 2017 ...
Страница 58: ...Preparations for use 4 19 Converter operation SIMOTICS FD 1MH1 58 Operating Instructions 08 2017 ...
Страница 104: ...Electrical connection 6 6 Connecting the auxiliary circuits SIMOTICS FD 1MH1 104 Operating Instructions 08 2017 ...
Страница 120: ...Start up 7 10 Setting the motor parameters at the converter SIMOTICS FD 1MH1 120 Operating Instructions 08 2017 ...
Страница 176: ...Disposal 11 4 Disposal of components SIMOTICS FD 1MH1 176 Operating Instructions 08 2017 ...
Страница 178: ...Service and Support SIMOTICS FD 1MH1 178 Operating Instructions 08 2017 ...
Страница 182: ...Quality documents SIMOTICS FD 1MH1 182 Operating Instructions 08 2017 ...
Страница 187: ......