128/348
Siemens Building Technologies
Basic Documentation RVP540 / RVP550
CE1P2488en
HVAC Products
Description of the heating engineer settings
18.10.2002
Terminal test
4.49 Output
test
•
Connections can be checked prior to commissioning
•
Wiring errors can be pinpointed very rapidly
The output test can be used for checking the wiring.
It is also termed relay test.
Setting range
Unit
Factory setting
--- / 0...10
Increment
- - -
The output test will automatically become available on this operating line.
With each test step, the respective output will be activated so that it can be checked. By
pressing the + / - buttons, it is possible to change from one test step to the next.
--- No
test
(all outputs switch according to the current operating state)
23
92
Z
2
4
1 2 3 4 5 6
7 8 9 10
0
4
8
12
16
20
24
b)
a)
c)
a) The pointer below the symbol indicates the output activated
b) The number indicates the current test step
c) The framed number indicates the selected setting line
When there is no operating action, the output test will automatically be quit after 8 min-
utes.
Benefit
Description
Setting
Effect
Display
Timeout
All outputs (Q101…Q110) are deactivated
Output Q101 activated
Output Q102 activated
Output Q103 activated
Output Q104 activated
Output Q105 activated
Output Q106 activated
Output Q107 activated
Output Q108 activated
Output Q109 activated
Output Q110 activated
Test step 0
Test step 1
Test step 2
Test step 3
Test step 4
Test step 5
Test step 6
Test step 7
Test step 8
Test step 9
Test step 10