5-25
POWR
E
CAMSHAFT AND VALVES
5. Measure:
●
Valve stem runout
Out of specification
→
Replace the
valve.
NOTE:
When replacing the valve always use a new
valve guide and valve seal.
Valve stem runout limit:
0.016 mm (0.0006 in)
Valve spring inspection
1. Measure:
●
Valve spring free length
a
Out of specification
→
Replace the
valve spring.
Valve spring free length:
37.85 ~ 39.85 mm
(1.491 ~ 1.569 in)
2. Measure:
●
Valve spring tilt
a
Out of specification
→
Replace the
valve spring.
Valve spring tilt limit:
1.7 mm (0.06 in)
Содержание Moray 25
Страница 1: ...SERVICE MANUAL MANUEL D ENTRETIEN WARTUNGSANLEITUNG MANUAL DE SERVICIO E F D ES Moray 25...
Страница 262: ...E BRKT SWIVEL BRACKET 7 17 EXPLODED DIAGRAM 7 17 REMOVAL AND INSTALLATION CHART 7 17...
Страница 356: ...E TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1...