8-26
–
+
ELEC
E
CHARGING SYSTEM
CHARGING SYSTEM PEAK VOLTAGE
1. Measure:
●
Rectifier/regulator output peak volt-
age
Excessively over specification
→
Replace.
Excessively below specification
→
Check the lighting coil.
† : Circuit
* : Loaded
Rectifier/regulator output (R – B)
r/min
Cranking
1500
3500
†
*
†
*
†
*
V
9
12
35
12
15
12
2. Measure:
●
Lighting coil output peak voltage
Below specification
→
Replace.
† : Circuit
* : Loaded
Lighting coil output peak voltage (Y – Y)
r/min
Cranking
1500
3500
†
*
†
*
†
*
V
10
10
25
25
60
65
FUSE
Refer to “STARTING SYSTEM”.
BATTERY
Refer to “GENERAL” in chapter 3.
Содержание Moray 25
Страница 1: ...SERVICE MANUAL MANUEL D ENTRETIEN WARTUNGSANLEITUNG MANUAL DE SERVICIO E F D ES Moray 25...
Страница 262: ...E BRKT SWIVEL BRACKET 7 17 EXPLODED DIAGRAM 7 17 REMOVAL AND INSTALLATION CHART 7 17...
Страница 356: ...E TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1...