5-12
E
POWR
STATOR AND TIMING BELT
STATOR AND TIMING BELT
EXPLODED DIAGRAM
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
Q’ty
Service points
STATOR AND TIMING BELT
REMOVAL
Follow the left “Step” for removal.
Flywheel magneto
Refer to “FLYWHEEL MAGNETO”.
1
Corregated plastic sheave
1
2
Stator lead
6
3
Stator
1
4
Timing belt
1
5
Drive sprocket
1
6
Woodruff key
1
7
Driven sprocket
1
8
Dowel pin
1
Reverse the removal steps for installation.
Содержание Moray 25
Страница 1: ...SERVICE MANUAL MANUEL D ENTRETIEN WARTUNGSANLEITUNG MANUAL DE SERVICIO E F D ES Moray 25...
Страница 262: ...E BRKT SWIVEL BRACKET 7 17 EXPLODED DIAGRAM 7 17 REMOVAL AND INSTALLATION CHART 7 17...
Страница 356: ...E TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1...