5-21
POWR
E
OIL PUMP
SERVICE POINTS
Cylinder head inspection
1. Measure:
●
Cylinder head warpage
Out of specification
→
Resurface or
replace the cylinder head.
Warpage limit:
0.1 mm (0.004 in)
Resurfacing steps:
●
Place a 400 ~ 600 grit wet sandpaper
on the surface plate.
●
Resurface the cylinder head using a
figure-eight sanding pattern.
NOTE:
To ensure an even surface, rotate the cyl-
inder head several times.
Oil pump inspection
1. Measure:
●
Clearances
a
,
b
, and
c
Out of specification
→
Replace the oil
pump.
Clearance:
a
: 0.03 ~ 0.15 mm
(0.001 ~ 0.006 in)
b
: 0.12 mm max. (0.005 in max.)
c
: 0.08 ~ 0.03 mm
(0.003 ~ 0.001 in)
Содержание Moray 25
Страница 1: ...SERVICE MANUAL MANUEL D ENTRETIEN WARTUNGSANLEITUNG MANUAL DE SERVICIO E F D ES Moray 25...
Страница 262: ...E BRKT SWIVEL BRACKET 7 17 EXPLODED DIAGRAM 7 17 REMOVAL AND INSTALLATION CHART 7 17...
Страница 356: ...E TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1...