2.9
Date Code 20170601
Instruction Manual
SEL-387-0, -5, -6 Relay
Installation
Rear-Panel Connections
Prewired Connectors
The wiring harness kit contains several prewired connectors for relay current
inputs, power, and ground connections. These prewired connectors include the
following:
➤
(4) six position CT shorting connectors for current inputs
IAW1
,
IBW1
, and
ICW1
;
IAW2
,
IBW2
, and
ICW2
;
IAW3
,
IBW3
, and
ICW3
; and
IAW4
,
IBW4
, and
ICW4
. For these connectors select a wire size
from AWG 16 to 10.
➤
(1) connector for
POWER
inputs (
+
and
–
). For these connectors
select a wire size from AWG 18 to 14.
➤
(1) spade connector for chassis
GROUND
connection.
Unwired Connectors
With the wiring harness kit are the following unwired connectors for the relay
optoisolated inputs, contact outputs, and EIA-485 communications port
connections:
➤
(2) eight position female plug in connectors for output contacts
OUT101
through
OUT104
and
OUT105
through
ALARM
.
➤
(2) six position female plug in connectors for optoisolated
inputs
IN101
through
IN103
and
IN104
through
IN106
.
➤
(1) eight position female plug in connector for the EIA-485
serial port connection
SERIAL PORT 1
and the demodulated
IRIG-B input. Alternatively, you can bring IRIG-B through
SERIAL PORT 2
.
➤
(4) six position female plug in connectors for interface board
output contacts
OUT201
through
OUT203
,
OUT204
through
OUT206
,
OUT207
through
OUT209
, and
OUT210
through
OUT212
.
➤
(2) eight position female plug-in connectors for interface board
optoisolated inputs
IN201
through
IN204
and
IN205
through
IN208
.
Connections
Frame Ground
For safety and performance, ground the relay chassis at terminal
GND
(
Z27
).
Connectorized relays provide a 0.250-inch-by-0.023-inch spade connector for
this connection. If the tab on the chassis is removed, the chassis ground
connection can be made with the size #6-32 screw. The grounding terminal of
either relay version connects directly to relay chassis ground.
Power Supply
Connect rear panel terminals marked
+
(
Z25
) and
–
(
Z26
) to a source of control
voltage. Control power passes through these terminals to a fuse(s) and to the
switching power supply. The control power circuitry is isolated from the frame
ground. The 24/48 V power supply is polarity sensitive. Refer to
Introduction and Specifications
for power supply voltage ranges.
NOTE:
These unwired connectors
accept wire sizes AWG 24 to 12. To
install these connectors, you will need
a wire stripping tool and small, slotted
tip screwdriver. Strip 0.31 inches
(8 mm) insulation from the wires and
install the wires in the connectors.
Secure each connector to the relay
chassis with the screws located on
each connector end.
Содержание SEL-387-0
Страница 6: ...This page intentionally left blank ...
Страница 12: ...This page intentionally left blank ...
Страница 50: ...This page intentionally left blank ...
Страница 200: ...This page intentionally left blank ...
Страница 248: ...This page intentionally left blank ...
Страница 380: ...This page intentionally left blank ...
Страница 422: ...This page intentionally left blank ...
Страница 440: ...This page intentionally left blank ...
Страница 458: ...This page intentionally left blank ...
Страница 516: ...This page intentionally left blank ...
Страница 540: ...This page intentionally left blank ...