10 - 144
Quick Start-up
2.5 Installation confirmation
Check as followings after the installation:
1. Check that the input and output cables meet the need of actual load.
2. Check that the accessories of the inverter are correctly and properly installed. The installation cables
should meet the needs of every component (including reactors, input filters, output filters, DC reactors,
braking units and braking resistors).
3. Check that the inverter is installed on non-flammable materials and the calorific accessories (reactors
and braking resistors) are away from flammable materials.
4. Check that all control cables and power cables are run separately and the routation complies with
EMC requirement.
5. Check that all grounding systems are properly grounded according to the requirements of the inverter.
6. Check that the free space during installation is sufficient according to the instructions in user’s manual.
7. Check that the installation conforms to the instructions in user’s manual. The drive must be installed in
an upright position.
8. Check that the external connection terminals are tightly fastened and the torque is appropriate.
9. Check that there are no screws, cables and other conductive items left in the inverter. If not, get them
out.
2.6 Basic commission
Complete the basic commissioning as followings before actual utilization:
1. Select the motor type, set correct motor parameters and select control mode of the inverter according
to the actual motor parameters.
2. Autotune. If possible, de-coupled from the motor load to start dynamic autotune. Or if not, static
autotune is available.
3. Adjust the ACC/DEC time according to the actual running of the load.
4. Commission the device via jogging and check that the rotation direction is as required. If not, change
the rotation direction by changing the wiring of motor.
5. Set all control parameters and then operate.
Содержание CV50-008-4F
Страница 1: ...USER MANUAL INVERTER CONTROLVIT CV50 ...
Страница 2: ......
Страница 84: ...84 144 Function Parameters ...
Страница 101: ...Fault Tracking 101 144 8 6 4 Undervoltage fault 8 6 5 Abnormal motor heat ...
Страница 102: ...102 144 Fault Tracking 8 6 6 Inverter overheating 8 6 7 Stall during the acceleration of the motor ...
Страница 131: ...Dimension Drawings Appendix B 131 144 18 5 30kW flange mounting 37 110kW flange mounting 132 200kW flange mounting ...
Страница 142: ... ...