
6 - 144
Safety precautions
1 Safety Precautions
1.1 What this chapter contains
Please read this manual carefully and follow all safety precautions before moving, installing, operating and
servicing the inverter. If ignored, physical injury or death may occur, or damage may occur to the devices.
If any physical injury or death or damage to the devices occurs for ignoring to the safety precautions in the
manual, our company will not be responsible for any damages and we are not legally bound in any manner.
1.2 Safety definition
Danger:
Serious physical injury or even death may occur if not follow relevant requirements
Warning:
Physical injury or damage to the devices may occur if not follow relevant requirements
Note:
Physical hurt may occur if not follow relevant requirements
Qualified
electricians:
People working on the device should take part in professional electrical and safety
training, receive the certification and be familiar with all steps and requirements of
installing, commissioning, operating and maintaining the device to avoid any emergency.
1.3 Warning symbols
Warnings caution you about conditions which can result in serious injury or death and/or damage to the
equipment, and advice on how to avoid the danger. Following warning symbols are used in this manual:
Symbols
Name
Instruction
Abbreviation
Danger
Electrical
Danger
Serious physical injury or even death may
occur if not follow the relative requirements
Warning
General danger
Physical injury or damage to the devices may
occur if not follow the relative requirements
Do not
Electrostatic
discharge
Damage to the PCB board may occur if not
follow the relative requirements
Hot sides
Hot sides
Sides of the device may become hot. Do not
touch.
Note
Note
Physical hurt may occur if not follow the
relative requirements
Note
1.4 Safety guidelines
Only qualified electricians are allowed to operate on the inverter.
Do not carry out any wiring and inspection or changing components when the power supply
is applied. Ensure all input power supply is disconnected before wiring and checking and
always wait for at least the time designated on the inverter or until the DC bus voltage is less
than 36V. Below is the table of the waiting time:
Inverter model
Minimum waiting time
400V 1.5kW-110kW
5 minutes
400V 132 kW-315 kW
15 minutes
400V above 350 kW
25 minutes
Содержание CV50-008-4F
Страница 1: ...USER MANUAL INVERTER CONTROLVIT CV50 ...
Страница 2: ......
Страница 84: ...84 144 Function Parameters ...
Страница 101: ...Fault Tracking 101 144 8 6 4 Undervoltage fault 8 6 5 Abnormal motor heat ...
Страница 102: ...102 144 Fault Tracking 8 6 6 Inverter overheating 8 6 7 Stall during the acceleration of the motor ...
Страница 131: ...Dimension Drawings Appendix B 131 144 18 5 30kW flange mounting 37 110kW flange mounting 132 200kW flange mounting ...
Страница 142: ... ...
Страница 143: ... ...