
11
-
WARRANTY
1. ENGINE WARRNTIES
■
ENGINE lIMITED WARRANTY
What is Covered by this Warranty?
ENGINE warrants to the original retail purchaser that a new ENGINE TNV common rail series industrial engine
will be free from defects in material and/or workmanship for the duration of the warranty period.
Note: ENGINE engines may be equipped with external components including, but not limited to: wiring
harnesses, electrical devices, control panels, radiators, air filters, fuel filters, and/or exhaust systems
that are supplied and/or installed by manufacturers other than ENGINE. For warranty information on
such external components, please contact the machine or component manufacturer directly or see your
authorized ENGINE dealer or distributor.
This warranty is provided in lieu of all other warranties, express or implied. ENGINE specifically disclaims
any implied warranties of merchantability or fitness for a particular purpose, except where such disclaimer
is prohibited by law. If such disclaimer is prohibited by law, then implied warranties shall be limited in
duration to the life of the express warranty.
how long is the Warranty Period?
The ENGINE standard limited warranty period runs for a period of twenty-four () months or two-thousand
(000) engine operation hours, whichever occurs first. An extended limited warranty of thirty-six () months or
three thousand (000) engine operating hours, whichever occurs first, is provided for these specific parts only:
the cylinder block, cylinder head, crankshaft forging, connecting rods, flywheel, flywheel housing, camshaft,
RK19-영문-11-보증서.indd 2
2017-05-18 오후 6:46:04
Содержание RK19 Hydrostatic
Страница 31: ...MEMO RK19 영문 01A 안 indd 30 2017 05 19 오전 9 41 34 ...
Страница 35: ...MEMO RK19 영문 01B 가 indd 4 2017 05 18 오후 6 37 58 ...
Страница 36: ...GENERAL INFORMATION 1 EXTRRIOR VIEW 1 2 2 SAFETY SIGNS 1 5 1 RK19 영문 01B 가 indd 1 2017 05 18 오후 6 37 59 ...
Страница 41: ...1 GENERAL INFORMATION DANGER R19O103A RK19 영문 01B 가 indd 6 2017 05 18 오후 6 38 02 ...
Страница 43: ...1 GENERAL INFORMATION GDQJHU T19O107C RK19 영문 01B 가 indd 8 2017 05 18 오후 6 38 05 ...
Страница 77: ...MEMO OPERATION RK19 영문 03 다 indd 8 2017 05 19 오전 9 45 17 ...
Страница 83: ...MEMO WORK PROCEDURE RK19 영문 04 라 indd 6 2017 05 18 오후 6 26 06 ...
Страница 107: ...MEMO MAINTENANCE AND SERVICE RK19 영문 05 마 indd 24 2017 05 18 오후 6 35 34 ...
Страница 108: ...Storage and Disposal 1 Tractor storage 6 2 2 Usage and disposal 6 3 6 RK19 영문 06 바 indd 1 2017 05 19 오전 9 47 27 ...
Страница 111: ...MEMO STORAGE AND DISPOSAL RK19 영문 06 바 indd 4 2017 05 19 오전 9 47 29 ...
Страница 121: ...MEMO TROUBLESHOOTING RK19 영문 07 사 indd 10 2017 05 19 오전 9 48 59 ...
Страница 129: ...MEMO SAFETY STANDARD FOR FARM WORK RK19 영문 08 아 indd 8 2017 03 07 오후 4 24 15 ...
Страница 130: ...Appendix 1 Major specifications 9 2 2 Major consumables 9 4 1 1 9 RK19 영문 09 자 indd 1 2017 05 18 오후 6 39 50 ...
Страница 134: ...INDEX 1 INDEX 10 2 10 RK19 영문 10 인덱스 indd 1 2017 05 18 오후 6 50 05 ...
Страница 139: ...RK19 영문 10 인덱스 indd 6 2017 05 18 오후 6 50 05 ...