A valve group is paused when the upper bar is flashing (Vlv. Time Litre Litre) During
the flow measurement, no data is displayed in the left column of the activity
summary. This summary appears automatically whenever a valve group is activated.
The summary scrolls on automatically when the controller switches to the next valve.
This ensures that the previous valve, the active valve and the next valve are always
shown on the display.
4.2
Start conditions by valve group
Day of time start
Time of time start
Alt. time start day
Alt. time start time
Cyclic start
Radiation start
Radiation sum start
Repetition
Contact start level
Influence on irrigation time
Influence on irrigation volume
Main pause time
Manual start
Number of starts
Path: Display summaries>Start conditions
Day of time start
The day when the next time start will be executed.
Time of time start
The time when the next time start will be executed.
Day of alternative time start
The day when the next alternative time start will be executed.
Time of alternative time start
The time when the next alternative time start will be executed.
Cyclic start
The day and time when the next cyclic start will be executed.
Radiation start
The time when the next radiation start is expected.
Radiation sum level for radiation start 0 - 1000 J/cm2
The radiation sum in J/cm², above which a radiation start will be executed.
Aqua CX300
65
Содержание Aqua CX300
Страница 1: ...SV 02 03 2020 96010102 User Manual Aqua CX300...
Страница 92: ......