43
3 à 4 mm
>1 min
3.1.3 Checking the condensate siphon
•
Check the condensate siphon. Remove any dirt resi-
dues and refill with clean water to the mark.
LT.AL.W7H.000.0233
3.1.4 Checking the ignition electrode
LT.AL.W7H.000.056
•
Check the ionisation /ignition electrode for:
- deposits (remove any white deposits with abrasive cloth);
-
the adjustment of the ignition electrode (between 3 and 4
mm);
-
the quality of the gasket and condition of the porcelain
(this should not be cracked);
•
Check the ionisation current after 1 minute on the display
code
f
l
,
see par
.
2.9.6.
If the read-out value is lower than 3 or higher than 9
μ
A,
check cable and connections are sound if OK replace the
ignition electrode.
z
The ignition cap is fixed on the ignition electrode and therefore
cannot be removed.
3.1.5
Checking the combustion
•
Measure the O
2
/CO
2
percentage and the flue gas tempera-
ture at the flue gas sample point.
Do this as follows:
LT.AL.W7H.000.057
- heat the water temperature in the boiler to approx. 70°C;
- unscrew the top of the flue gas point of measurement;
- measure the O
2
/CO
2
percentage and compare this to the
check values in
table 10.
z
Ensure that the analysing probe has a gas tight seal in the
sampling point with the probe end in the centre of the flue
duct.
Содержание Avanta Plus 24s
Страница 94: ...30...
Страница 95: ...31...
Страница 97: ...2 AVANTA PLUS 28 Combi Gas Council No 47 673 02 39 Combi Gas Council No 47 673 04...
Страница 100: ...5...
Страница 104: ...9...
Страница 107: ...12 AVANTA PLUS 24 System Gas Council No 41 288 05...
Страница 110: ...15...
Страница 118: ...User guide Remeha Avanta Plus Remeha Avanta Plus 28c Remeha Avanta Plus 39c Remeha Avanta Plus 24s...
Страница 146: ...1 Issue No 1 Date 8 December 2005 Operating instructions for the built in Two Channel Digital electronic time clock...
Страница 149: ...4 6 Description of setting buttons and display M T W Th F S Su DAY HR MIN Set 5 Position of Timer in boiler when fitted...