1. Isolating the power supply and opening the front cover
LT.AL.W7H.000.037
•
Switch off the boiler at the fused spur and remove the fuse;
•
Remove the front panel (release the two screws at the bot-
tom of the front panel, pull the bottom of the panel; forward
and lift off the two pins on the top of the main casing).
2. Checking the connections and making the boiler
operational
z
Open the valves on all the radiators connected to the central
heating system before filling the system with water.
LT.AL.W7H.000.038
•
Open the valves on all the radiators connected to the
central heating system;
•
Fill the system with water to the design operating pressure
(normal for a one/two storey house 1.2 bar, minimum
pressure 1 bar, maximum pressure 2.5 bar);
•
Whilst filling, air from the system will escape through the
automatic air vents and the pump.
m
•
When the vent caps start leaking water, close them with
the vents caps supplied.
•
Avoid water getting into the boiler.
•
Check the condensate siphon. This should be filled to the
mark with clean water if necessary.
Содержание Avanta Plus 24s
Страница 94: ...30...
Страница 95: ...31...
Страница 97: ...2 AVANTA PLUS 28 Combi Gas Council No 47 673 02 39 Combi Gas Council No 47 673 04...
Страница 100: ...5...
Страница 104: ...9...
Страница 107: ...12 AVANTA PLUS 24 System Gas Council No 41 288 05...
Страница 110: ...15...
Страница 118: ...User guide Remeha Avanta Plus Remeha Avanta Plus 28c Remeha Avanta Plus 39c Remeha Avanta Plus 24s...
Страница 146: ...1 Issue No 1 Date 8 December 2005 Operating instructions for the built in Two Channel Digital electronic time clock...
Страница 149: ...4 6 Description of setting buttons and display M T W Th F S Su DAY HR MIN Set 5 Position of Timer in boiler when fitted...