42
Remeha Avanta Plus
2 bar
Min. 1 bar
3.1.1 Checking the water pressure
The water pressure should be checked against the commis-
sioning entry in the Boiler Log Book (min 1 bar)
•
If necessary, re-fill system to design pressure and re-set red
pointer to match fill pressure 2 bar.
LT.AL.W7H.000.054
z
Check system for leaks if the system needs re-filling more
than 3 times per year.
3.1.2 Checking the flue pipes and air supply pipes for
leaks
•
Check that the flue and air-supply connections and
pipes are sealed and the terminal exit is clear.
LT.AL.W7H.000.055
Содержание Avanta Plus 24s
Страница 94: ...30...
Страница 95: ...31...
Страница 97: ...2 AVANTA PLUS 28 Combi Gas Council No 47 673 02 39 Combi Gas Council No 47 673 04...
Страница 100: ...5...
Страница 104: ...9...
Страница 107: ...12 AVANTA PLUS 24 System Gas Council No 41 288 05...
Страница 110: ...15...
Страница 118: ...User guide Remeha Avanta Plus Remeha Avanta Plus 28c Remeha Avanta Plus 39c Remeha Avanta Plus 24s...
Страница 146: ...1 Issue No 1 Date 8 December 2005 Operating instructions for the built in Two Channel Digital electronic time clock...
Страница 149: ...4 6 Description of setting buttons and display M T W Th F S Su DAY HR MIN Set 5 Position of Timer in boiler when fitted...