3
2.10 Putting the boiler out of operation
39
2.10.1 Boiler with frost protection, during longer periods of non-use
39
2.10.2 Boiler without frost protection, during longer periods of non-use
39
3 INSPECTION
AND
MAINTENANCE
40
3.1
Inspection
40
3.1.1 Checking
the
water
pressure
41
3.1.2 Checking
the
fl
ue pipes and air supply pipes for leaks
41
3.1.3 Checking
the
condensate
siphon
42
3.1.4 Checking
the
ignition
electrode
42
3.1.5 Checking
the
combustion
42
3.2
Maintenance
43
4 ERRORS
49
4.1
General
49
4.2
Error
codes
49
4.3 Control stop or shut down
51
4.4
Error
memory
51
4.4.1 Error
read
outs
52
4.4.2 Deleting
errors
52
5 SERVICE
PARTS
53
5.1
General
53
6
EC DECLARATION
56
7 REGULATIONS
57
7.1
EC
regulations
57
7.2 Remeha factory test
57
8
TECHNICAL SPECIFICATIONS AND WORKING PRINCIPLE
58
8.1
Technical
data
58
8.2
The
boiler
components
59
8.3
Working
principle
59
8.3.1 Regulating
60
8.3.2 Advanced
boiler
control
(‘abc
®
’-control) 60
8.3.3
Regulating the water temperature
61
8.3.4 Low
fl
ow / water protection
61
8.3.5 High
Limit
temperature
protection
61
9
EFFICIENCY DATA AND GAS EFFICIENCY LABELS
62
9.1
Annual
ef
fi
ciency
62
9.2
Water-side
ef
fi
ciency
62
Содержание Avanta Plus 24s
Страница 94: ...30...
Страница 95: ...31...
Страница 97: ...2 AVANTA PLUS 28 Combi Gas Council No 47 673 02 39 Combi Gas Council No 47 673 04...
Страница 100: ...5...
Страница 104: ...9...
Страница 107: ...12 AVANTA PLUS 24 System Gas Council No 41 288 05...
Страница 110: ...15...
Страница 118: ...User guide Remeha Avanta Plus Remeha Avanta Plus 28c Remeha Avanta Plus 39c Remeha Avanta Plus 24s...
Страница 146: ...1 Issue No 1 Date 8 December 2005 Operating instructions for the built in Two Channel Digital electronic time clock...
Страница 149: ...4 6 Description of setting buttons and display M T W Th F S Su DAY HR MIN Set 5 Position of Timer in boiler when fitted...