30
Remeha Avanta Plus
230 V
Check
C
•
Check the integral boiler pump – remove chrome centre
screw to vent pump and spin the shaft to check that the
impellor can move freely;
•
Check that all boiler connections are watertight;
LT.AL.W7H.000.039
•
Open the boiler gas valve and check the static pressure to
the boiler at the measurement point (C) on the gas block.
m
The boiler has been factory tested for natural gas at 20 mbar.
The minimum gas inlet pressure is 17 mbar for natural gas.
•
Check that the gas supply to the boiler is gas tight (in
compliance with the current regulations, see
Chapter
7
the
maximum test pressure at the gas pipe inlet, with the boiler
gas valve open, is 60 mbar.
•
Vent the gas pipe by unscrewing the measurement point
(C) on the gas block (tighten it again as soon as the pipe is
fully vented).
•
Check that the gas connections in the boiler are sealed.
•
Check that all electrical connections, including the earth
connection, have been made correctly.
•
Check the electrical connections to the thermostat and
other external controls.
•
Check that the flue-gas and air-supply connections are
sealed.
LT.AL.W7H.000.040
3. Switching the boiler on and setting the controls
LT.AL.W7H.000.041
•
Replace the fuse in the spur and switch on the 230 V
power supply.
•
Set the controls to heat demand.
•
The boiler will begin an automatic venting-programme
(which lasts approx. 3 minutes) and will do this every time
the power supply is isolated.
•
The boiler now starts to run. The operational status is
shown in the display. The normal operating status finally
shows
0
in the display.
Содержание Avanta Plus 24s
Страница 94: ...30...
Страница 95: ...31...
Страница 97: ...2 AVANTA PLUS 28 Combi Gas Council No 47 673 02 39 Combi Gas Council No 47 673 04...
Страница 100: ...5...
Страница 104: ...9...
Страница 107: ...12 AVANTA PLUS 24 System Gas Council No 41 288 05...
Страница 110: ...15...
Страница 118: ...User guide Remeha Avanta Plus Remeha Avanta Plus 28c Remeha Avanta Plus 39c Remeha Avanta Plus 24s...
Страница 146: ...1 Issue No 1 Date 8 December 2005 Operating instructions for the built in Two Channel Digital electronic time clock...
Страница 149: ...4 6 Description of setting buttons and display M T W Th F S Su DAY HR MIN Set 5 Position of Timer in boiler when fitted...