3 INSPECTION AND MAINTENANCE
The Remeha Avanta Plus is practically maintenance free but
should be inspected annually.
z
If during the annual inspection the flue gas analysis indicates
that the values are outside the figures given
in table 10
,
maintenance work should be carried out as described in
par.3.2.
Also carry out maintenance if the ionisation read-out
value is lower than 3 or higher than 9
μ
A, or when the flame
core is not satisfying.
Only Remeha spare parts/materials should be used.
All service and maintenance must be carried out by a quali-
fied Engineer with the relevant training and certification (i.e.
CORGI - ACS - IEE registrations etc).
3.1 Inspection
LT.AL.W7H.000.053
The annual inspection of the Remeha Avanta Plus can be lim-
ited to the following checks:
- check the water pressure,
see par. 3.1.1;
- check the flue pipes and air supply pipes for leaks,
see par.
3.1.2.;
- check and clean (if necessary) the condensate siphon,
see
par.3.1.3.;
- check the ignition electrode and ionisation,
see par. 3.1.3;
- check the combustion and flame colour,
see par. 3.1.5;
- fill in the Boiler Log Book
.
Содержание Avanta Plus 24s
Страница 94: ...30...
Страница 95: ...31...
Страница 97: ...2 AVANTA PLUS 28 Combi Gas Council No 47 673 02 39 Combi Gas Council No 47 673 04...
Страница 100: ...5...
Страница 104: ...9...
Страница 107: ...12 AVANTA PLUS 24 System Gas Council No 41 288 05...
Страница 110: ...15...
Страница 118: ...User guide Remeha Avanta Plus Remeha Avanta Plus 28c Remeha Avanta Plus 39c Remeha Avanta Plus 24s...
Страница 146: ...1 Issue No 1 Date 8 December 2005 Operating instructions for the built in Two Channel Digital electronic time clock...
Страница 149: ...4 6 Description of setting buttons and display M T W Th F S Su DAY HR MIN Set 5 Position of Timer in boiler when fitted...