2
Remeha Avanta Plus
INTRODUCTION
1 SAFETY
5
1.1
General
safety
5
1.2 Safety during assembly and installation
5
1.3 Safety during installation, inspection and maintenance
5
2 INSTALLATION
7
2.1 Scope of delivery
7
2.2 Mounting the boiler
7
2.2.1 Clearance
requirements
7
2.2.2 Dimensions
and
connection
points.
8
2.2.3 Mounting
the
Remeha
Avanta
Plus
10
2.3
Water-side
connections
10
2.3.1 Water
fl
ow
10
2.3.2 Circulation
pumps
11
2.3.3 Additional guidelines for the domestic and CH water
11
2.3.4 Water
treatment
11
2.3.5 Safety
valve
discharge
12
2.3.6 Expansion
vessel
13
2.3.7
Connecting DHW pipes (Combi-type only)
13
2.3.8 Connecting
the
‘CH
return’
14
2.3.9 Connecting
‘CH
fl
ow’
14
2.3.10
Connecting
condensate
drain
15
2.3.11
Connecting
under
fl
oor heating
15
2.4
Gas-side
connections
15
2.4.1
Additional guidelines for gas connections
15
2.4.2 Connecting
the
gas
supply
16
2.5 Flue terminal and air supply connections
16
2.5.1 Flue
terminal
positions
16
2.5.2 Room
sealed
fl
ue
17
2.5.3 Connecting
the
fl
ue terminal and air supply
18
2.6
Electrical
connection
19
2.6.1 The
control
unit
19
2.7 Connecting external controls
20
2.7.1
On/off control – room temperature (volt free switching)
22
2.7.2
Time control using an internal or external 230 V clock
23
2.7.3
Connecting a 230 V time clock in combination with a modulating room control
23
2.7.4
Modulating control – room or outside compensation
23
2.7.5
Connecting an outside temperature sensor
24
2.7.6 Connecting
the
DHW
sensor/thermostat
25
2.7.7 Connecting
a
frost
protection
device
25
2.7.8
Connecting an external interlock
26
2.7.9
Connecting remote alarm and boiler run indication
26
2.7.10
Connecting
a
PC/PDA
26
2.8
Wiring
diagram
27
2.9
Commissioning
27
2.9.1 Control
Panel
27
2.9.2 Additional
guidelines
for
commissioning
27
2.9.3
Putting the boiler into operation
27
2.9.4 Normal
start-up
procedure
33
2.9.5
Error during the start-up procedure
33
2.9.7
Adjust the boiler according to the system
35
2.9.8
Changing the parameters at service level (with access code)
35
2.9.9
Changing the maximum output (Hi) for CH operation
37
2.9.10
Restore
factory
settings
39
Содержание Avanta Plus 24s
Страница 94: ...30...
Страница 95: ...31...
Страница 97: ...2 AVANTA PLUS 28 Combi Gas Council No 47 673 02 39 Combi Gas Council No 47 673 04...
Страница 100: ...5...
Страница 104: ...9...
Страница 107: ...12 AVANTA PLUS 24 System Gas Council No 41 288 05...
Страница 110: ...15...
Страница 118: ...User guide Remeha Avanta Plus Remeha Avanta Plus 28c Remeha Avanta Plus 39c Remeha Avanta Plus 24s...
Страница 146: ...1 Issue No 1 Date 8 December 2005 Operating instructions for the built in Two Channel Digital electronic time clock...
Страница 149: ...4 6 Description of setting buttons and display M T W Th F S Su DAY HR MIN Set 5 Position of Timer in boiler when fitted...