Chapter 2: VTrak Installation
19
Figure 11. JBOD expansion with no single point of failure
O
I
O
I
O
I
O
I
O
I
O
I
O
I
O
I
Mgmt
UPS
115200
8 N 1
FC 1
FC 2
4
2
1
Gb/s
4
2
1
Gb/s
Mgmt
UPS
115200
8 N 1
FC 1
FC 2
4
2
1
Gb/s
4
2
1
Gb/s
O
I
O
I
E310f
Host PCs or Servers
J300s
J300s
Fibre Channel Switches
J300s
J300s
Содержание E310f
Страница 1: ...VTRAK E Class E310f and E310s PRODUCT MANUAL Version 1 1 ...
Страница 14: ...VTrak E Class Product Manual xiv ...
Страница 22: ...VTrak E Class Product Manual 8 ...
Страница 58: ...VTrak E Class Product Manual 44 ...
Страница 61: ...Chapter 4 Management with WebPAM PROe 47 Figure 1 The WebPAM PROe log in screen ...
Страница 215: ...Chapter 5 Management with the CLU 201 Shutdown complete It is now safe to power off the subsystem ...
Страница 218: ...VTrak E Class Product Manual 204 ...
Страница 228: ...VTrak E Class Product Manual 214 11 Verify that the Fan LEDs are green This completes the blower replacement procedure ...
Страница 234: ...VTrak E Class Product Manual 220 Figure 13 Replacing the VTrak controller ...
Страница 304: ...VTrak E Class Product Manual 290 ...
Страница 316: ...VTrak E Class Product Manual 302 ...