Chapter 5: Management with the CLU
163
3.
Highlight
Transport
and press Enter.
4.
Press Y to confirm.
Rebuilding a Disk Array
Before you can rebuild, you must have a replacement physical drive of adequate
capacity or your disk array. To rebuild a disk array:
1.
From the Main Menu, highlight
Disk Array Management
and press Enter.
2.
Highlight the disk array you want and press Enter.
3.
Highlight
Background Activities
and press Enter.
4.
Highlight
Rebuild
and press Enter.
5.
Specify the source and target physical drives.
6.
Highlight
Start
and press Enter.
Migrating a Disk Array
In order to migrate RAID level, you may have to add physical drives. For more
information, see “RAID Level Migration” on page 241.
To migrate a disk array:
1.
From the Main Menu, highlight
Disk Array Management
and press Enter.
2.
Highlight the disk array you want and press Enter.
3.
Highlight
Background Activities
and press Enter.
4.
Highlight
Migration
and press Enter.
5.
Highlight the physical drive you want to add and press the spacebar to select
it.
Repeat this action to add more physical drives.
6.
Highlight
Save Settings and Continue
and press Enter.
7.
To change RAID level, Highlight the logical drive in the list and press Enter.
8.
Highlight
RAID Level
and press the spacebar to toggle through the available
RAID levels.
9.
Optional. If you want to increase capacity, highlight
Expand Capacity
and
press the spacebar to toggle to
Yes
.
Notes
•
You can add physical drives to a RAID 50 or 60 array but you
cannot change the number of axles.
•
If you add an odd number of physical drives to a RAID 10
array, it will become a RAID 1E array by default.
Содержание E310f
Страница 1: ...VTRAK E Class E310f and E310s PRODUCT MANUAL Version 1 1 ...
Страница 14: ...VTrak E Class Product Manual xiv ...
Страница 22: ...VTrak E Class Product Manual 8 ...
Страница 58: ...VTrak E Class Product Manual 44 ...
Страница 61: ...Chapter 4 Management with WebPAM PROe 47 Figure 1 The WebPAM PROe log in screen ...
Страница 215: ...Chapter 5 Management with the CLU 201 Shutdown complete It is now safe to power off the subsystem ...
Страница 218: ...VTrak E Class Product Manual 204 ...
Страница 228: ...VTrak E Class Product Manual 214 11 Verify that the Fan LEDs are green This completes the blower replacement procedure ...
Страница 234: ...VTrak E Class Product Manual 220 Figure 13 Replacing the VTrak controller ...
Страница 304: ...VTrak E Class Product Manual 290 ...
Страница 316: ...VTrak E Class Product Manual 302 ...