Chapter 2: VTrak Installation
25
Figure 17. JBOD expansion with no single point of failure
This completes Network and Data connections for VTrak E310s. Go to “Making
Serial Cable Connections” on page 26.
O
I
O
I
O
I
O
I
O
I
O
I
O
I
O
I
Mgmt
UPS
115200
8 N 1
Mgmt
UPS
115200
8 N 1
O
I
O
I
E310s
Host PCs or Servers
J300s
J300s
J300s
J300s
Содержание E310f
Страница 1: ...VTRAK E Class E310f and E310s PRODUCT MANUAL Version 1 1 ...
Страница 14: ...VTrak E Class Product Manual xiv ...
Страница 22: ...VTrak E Class Product Manual 8 ...
Страница 58: ...VTrak E Class Product Manual 44 ...
Страница 61: ...Chapter 4 Management with WebPAM PROe 47 Figure 1 The WebPAM PROe log in screen ...
Страница 215: ...Chapter 5 Management with the CLU 201 Shutdown complete It is now safe to power off the subsystem ...
Страница 218: ...VTrak E Class Product Manual 204 ...
Страница 228: ...VTrak E Class Product Manual 214 11 Verify that the Fan LEDs are green This completes the blower replacement procedure ...
Страница 234: ...VTrak E Class Product Manual 220 Figure 13 Replacing the VTrak controller ...
Страница 304: ...VTrak E Class Product Manual 290 ...
Страница 316: ...VTrak E Class Product Manual 302 ...