Specifications
Hardware Description
2-51
Conversion factors for power dissipation are the following:
BTU/hr = Watts x 3.413
Kcal/hr = Watts x 0.8598
Conversion factor for air conditioning requirements for power dissipation is:
air conditioning power dissipation
1 ton = 8900 BTU/hr = 3024 Kcal/hr
Customer
Supplied
Displays
The following table gives recommended requirements for displays and video cables connected
to Information Centers and Clients.
Note
For displays and video cables not supplied by Philips as part of an Information Center system:
•
The support user is responsible for all aspects of their selection, purchase, installation,
repair, and disposal
•
Philips cannot assure their system compatibility
•
Philips cannot assure compliance with the ECG aspect ratio and 25 mm/s +10% sweep
speed specification of Information Center software, which complies with the ANSI/
AAMI EC-13 Standard for Cardiac Monitors, Heart-Rate Meters, and Alarms.
UPS for Database Server
(1000 VA, 230V)
M3883-60001
160 - 286
n/a
50 - 60
Power Distribution Module
M3166-60000
100, 120 -127,
200, 200 - 240
Yes
50 - 60
Table 2-6. Electrical Specifications of Database Server Components
Philips Component
Product
Part #
Input Voltage
(VAC)
Manual
Switching
Required?
Input
Frequency
(Hz)
Dissipated
Power (max)
(Watts)
Table 2-7. Recommended Display Specifications for Information Center Displays
Specification
Value
Screen Resolution
1280 x 1024
Vertical Refresh Rate
60 Hz
Содержание IntelliVue Series
Страница 152: ...IntelliVue Information Center Application Software 3 22 Software Description ...
Страница 442: ...Troubleshooting 7 156 Maintenance Troubleshooting and Repair ...
Страница 488: ...Procedure B 12 Web Installation on the Database Server ...
Страница 492: ...Procedure C 4 External Modem Installation ...
Страница 500: ...Using RAS D 8 Dial In Procedure for Remote Access to Information Center Systems ...