Aquarea air/water heat pump – Installation manual for monobloc and split systems C, D and E series 05 / 2014
4
Location /
Installation
Location | Installing and fastening the devices
Installation
Monobloc systems or split system outdoor units
4.2 Installation
4.2.1 Installing the monobloc unit or split system outdoor unit
Danger!
Multiple persons are required to install the monobloc unit or split sys-
tem outdoor unit . Otherwise, the weight of the unit can lead to injuries .
Transport and lifting equipment must be suitable for the unit weight .
If possible, the monobloc unit or split system outdoor unit should only be
moved with the appropriate transport and lifting equipment . The lifting
equipment can be attached to the base structure of the unit using lugs .
➤
Transport the unit to the planned installation location .
➤
Remove the packaging carefully .
➤
Fasten the unit with four M12 anchor bolts
(tightening force > 15,000 N)
Transport the unit carefully to avoid damage . That includes placing / low-
ering the unit in the installation location .
1
Floor
2
Stone / gravel
3
Concrete or floor plate
4
Anchor bolt
≥
60
mm
≥
300
mm
>
20
mm
80
mm
4
3
3
4
2
1
Minimum requirements for anchoring the monobloc unit to the floor or a foundation (left) or directly to a base plate (right)
Monobloc unit drilling template
980
1,280
355.
5
32
0
Warning!
A correct drain or soak away must be installed to allow the condensate
from the condenser to disperse fully . Failure to observe this may cause
a slip hazard if allowed to freeze around the condenser . Internal dam-
age can also occur if not drained correctly .