10 – 88
Aquarea air/water heat pump – Installation manual for monobloc and split systems C, D and E series 05 / 2014
Appendix
Commissioning report
AQUAREA – COMMISSIONING R3 NOV13
Project
Date:
DATE
Outdoor Model:
Site Address
Outdoor Serial No:
Indoor Model:
Town
Indoor Serial No:
County
Tank Model
Distributor
Tank Serial No:
Contractor
Expansion Vessel
Site Engineer
3rd Party Tank Type
Type of System
Capacity
Indoor to Tank :
ID TO TANK m
Water Pipe Size :
Monobloc to Tank :
m
Water Pipe Size :
Water Volme (Primary) :
Ltrs
Anti-Freeze Added :
%
=
Wiring
Power Supply 1
Power Supply 2
Refrigerant Pipework
(Bi-Bloc Only)
Fuse Rating:
1_FUSE
2_FUSE
Bi-Bloc to indoor
(3m M in)
Isolator: [Y/N]
1_ISOLATOR
2_ISOLATOR
Additional Charge :
L-N
1_L-N
2_L-N
Gas Pipe Size :
L-E
1_L-E
2_L-E
Liquid Pipe Size :
N-E
1_N-E
2_N-E
Vacuum Test
Max Running Amps
1_MAX_AMPS
2_MAX_AMPS
Pressure Test
Checks
Heating Mode
Solar Connections
YES
NO
Water Flow Test
l/min
DHW Mode
Water Flow Test
l/min
CAPACITY - Ltrs
3RD PARTY TANK
EXPANSION VESSEL
TYPE OF SYSTEM
SITE ENGINEER
CONTRACTOR
DISTRIBUTOR
TANK SERIAL
TANK MODEL
IDE SERIAL
ID MODEL
OD SERIAL
PROJECT
OD MODEL
COUNTY
TOWN
SITE ADDRESS 1
SITE ADDRESS 2
Plumbing Pipework
(Monobloc and Bi-Bloc)
°C
Torr
Bar
PUMP SPEED
Pump Speed
SOLAR CONNECTIONS
3-Way Valve Check :
YES / NO
m
kg
Power Supply 3
3_MAX_AMPS
3_N-E
TEL NO.
Tel No:
POSTCODE
Postcode
3_L-E
3_L-N
3_ISOLATOR
1_FUSE
Wiring Connections
NOTE:
1
2
3
4
5
6
7
8
9
10 11 12
13 14 15 16 17 18
19 20 21
22 23
Close
Open
N
Close
Open
N
L
N
L
N
Cool
Heat
Vo
lt
free
Vo
lt
free
N
Close
Open
H T N
Notes :
Please indicate any
observations relating to
the installation that may
assist in understanding
how the system has
been installed.
These observations
may assist in any future
warranty claim or
NOTES
Please ensure that all
connections are clearly
marked / indicated
LINK REQ. WITH 3rd
PARTY TANK
3-WAY VALVE
1 = CLOSE ON B
Solar
Pump
Solar 3-Way
Valve
3-Way Valve
2-Way Valve
Receiver
Booster
External
Control.
Tank
Sensor
OLP
NO
°C
NO
10 Appendix
10.1 Commissioning report