TABLE OF CONTENTS
LIST OF ILLUSTRATIONS (Cont.)
FIGURE NO.
TITLE
Page No.
3-52
Solder points on bottom of Load Cell PCB ..........................................................3-27
3-53
Up/Down Stop Plate ............................................................................................3-28
3-54
Removing Temperature Conductor .....................................................................3-28
3-55
Removing screws that secure the Magnet Cover................................................3-28
3-56
Lifting off the Magnet Cover ................................................................................3-28
3-57
Removing Thumb screws that hold Hanger in place ...........................................3-29
3-58
Load Cell without Hanger and Brass Fixture .......................................................3-29
3-59
Screws on each side of yoke holding Ratio Beam must be removed .................3-29
3-60
Ratio Beam, removed from Load Cell .................................................................3-30
3-61
Magnet gap and Temperature Sensor Tube should be
carefully examined for dust and debris................................................................3-30
3-62
Coil Assembly should be carefully examined and cleaned .................................3-30
3-63
Yoke of Ratio Beam must align with frame of Load Cell .....................................3-31
3-64
Installing Ratio Beam with hole centered over the Temperature Sensor Tube ...3-31
3-65
Yoke aligned with frame side-to-side, and flush with frame on front ...................3-32
3-66
Centering Pin goes into Temperature Sensor Tube in middle of Magnet ...........3-33
3-67
Hanger installed, with Brass Fixture and Brass Brackets....................................3-34
3-68
Magnet Cover has oblong hole that clears Ratio Beam’s stop tab......................3-35
3-69
Inserting screws to secure the Magnet Cover .....................................................3-35
3-70
Inserting the Temperature Conductor in the middle of the Magnet Cover...........3-35
3-71
The Temperature Conductor groove should line up with the two Screws ...........3-35
3-72
Up/Down Stop Plate which rests on Magnet Cover ............................................3-36
3-73
Up/Down Stop Plate inserted over Ratio Beam tab
and PCB screw receptacle on Magnet Cover .....................................................3-36
3-74
Load Cell PCB is secured with 2 screws (with Step Bushing on the back) .........3-36
3-75
Fine wires must have smooth arc for the balance to function properly ...............3-37
3-76
Load Cell should rest on Threaded Rod, and base of frame...............................3-38
3-77
Installing the bottom Flexure Arm........................................................................3-39
3-78
Top Flexure Arm Assembly, with Flexure screw heads facing outward ..............3-39
3-79
Installing the upper Flexure Arm .........................................................................3-39
3-80
Load Flexure, aluminum washers, steel washers and screws ............................3-40
3-81
Load Flexure on top of Hanger, with elongated screw hole at bottom ................3-40
3-82
Hanger with Thumb screws removed ..................................................................3-41
3-83
Pushing Brass Fixture from grooved side ...........................................................3-41
3-84
Pulling Brass Fixture out from square side..........................................................3-41
3-85
Note stops on sides of bottom Load Cell Cover ..................................................3-42
3-86
Tightening screws on bottom Load Cell Cover....................................................3-42
3-87
Top Load Cell Cover rests flush against bottom cover........................................3-43
3-88
Tightening screws on top Load Cell Cover..........................................................3-43
3-89
If Hanger moves smoothly, assembly is successful ............................................3-44
3-90
Load Cell Chassis with keyway at point of triangle .............................................3-45
3-91
Three screws on bottom that secure the Load Cell to the Chassis .....................3-45
3-92
Cantilever Arm in correct position .......................................................................3-45
3-93
Replacing Load Cell Cover..................................................................................3-46
3-94
Load Cell with Cover in proper position, cables resting in notches .....................3-46
3-95
Placing PCB Mounting Plate on Load Cell ..........................................................3-47
3-96
Stand-off screws secure PCB Mounting Plate ....................................................3-47
3-97
Installing Weights and Weight Holders................................................................3-48
Ohaus Corporation www.ohaus.com
iv
Discovery Balance Service Manual
Содержание DISCOVERY BALANCE
Страница 2: ......
Страница 4: ......
Страница 10: ...TABLE OF CONTENTS Ohaus Corporation www ohaus com vi Discovery Balance Service Manual...
Страница 99: ...80104135 P N 80104135 SERVICE MANUAL DISCOVERY BALANCE...