CHAPTER 3 REPAIR PROCEDURES
3.2.2 Load Cell Disassembly
3. Tip the Load Cell onto the back frame and loosen the 2 screws that connect the
bottom Flexure Arm to the frame, NO MORE than half a turn.
This is preparation for installing the fixture to protect the Flexure Arms.
Screw connecting
bottom Flexure Arm
assembly to frame
Screw connecting
bottom Flexure Arm
assembly to frame
Figure 3-35. Screws on bottom Flexure Arm assembly.
Screw connecting
top Flexure Arm
assembly to frame
Screw connecting top
Flexure Arm assembly
to frame
Figure 3-36. Screws on top Flexure Arm assembly.
4. Loosen the 2 screws that connect the top Flexure Arm assembly to the frame,
NO MORE than half a turn. This is preparation for mounting the fixture to protect the
Flexure Arms.
Discovery Balance Service Manual
3-21
Ohaus Corporation www.ohaus.com
Содержание DISCOVERY BALANCE
Страница 2: ......
Страница 4: ......
Страница 10: ...TABLE OF CONTENTS Ohaus Corporation www ohaus com vi Discovery Balance Service Manual...
Страница 99: ...80104135 P N 80104135 SERVICE MANUAL DISCOVERY BALANCE...