CHAPTER 3 REPAIR PROCEDURES
3.2.4 Load Cell Assembly
5.20. Remove Brass Rod and check vertical centering over Temperature Sensor
Tube and around Magnet.
5.21. Tighten screws on yoke, checking again to ensure Ratio Beam remains
centered.
5.22. Re-tighten Threaded Rod.
5.23. Re-install Hanger and Thumb screws, and Brass Rod, and re-check centering.
NOTE:
Repeat the process as necessary to ensure that the Ratio Beam is centered.
6. Re-check that everything is assembled properly.
7. Remove the Brass Rod and Threaded Rod and ensure that the Ratio Beam moves
up and down without binding.
8. When satisfied that the Ratio Beam moves correctly, reinstall the Brass Rod and
Threaded Rod.
9. Install the Hanger with the Brass Fixture and the Thumb Screws from the Service
Toolset. The Brass Fixture is inserted between the Hanger and the frame of the
Load Cell. Use the Brass Brackets from the Service Toolset to position it properly.
Then tighten the Thumb Screws.
10. Double-check that the Ratio Beam is centered. Repeat process as necessary.
NOTE:
The Hanger should be positioned evenly around the Ratio Beam.
The Hanger’s left and right gap areas should be even when it is installed correctly.
Right gap area
Left gap area
Right side
Bracket
Left side
Bracket
Brass
Fixture
Hanger
Figure 3-67. Hanger installed, with Brass Fixture
and Brass Brackets.
Ohaus Corporation www.ohaus.com
3-34
Discovery Balance Service Manual
Содержание DISCOVERY BALANCE
Страница 2: ......
Страница 4: ......
Страница 10: ...TABLE OF CONTENTS Ohaus Corporation www ohaus com vi Discovery Balance Service Manual...
Страница 99: ...80104135 P N 80104135 SERVICE MANUAL DISCOVERY BALANCE...