
10.6-4
Cartridge can be removed by
loosing two screws.
ܭ
CAUTION
It is not necessary to remove tube.
Fig. 10.6-4 Removed method of cartridge
10.6.2.2. Check of accuracy of blood leak sensor using pseudo filter
(1) Press [Prep.] SW to shift to preparation process.
(2) Check preparation time pass over 5 minutes and then check ”6. BLD AUTO ZERO” value
more –80ppm in maintenance mode 1 screen.
(3) Remove cartridge of blood leak detector as shown in Fig.10.6-4.
ܭ
CAUTION
z
It is possible that “E22 BLOOD LEAK SENSOR ERROR” is detected when cartridge removes.
In this situation, set pseudo filter after resetting above alarm.
(4) Check “6. BLD AUTO ZERO” value to 400
650ppm in maintenance mode 1 screen
when cartridge as shown Fig.10.6-5 set.
Maintenance mode 1: BLD AUTO ZERO
Normal
80ppm
Cartridge with filter
400
650ppm
Fig. 10.6-5 Pseudo filter
Содержание SURDIAL
Страница 2: ......
Страница 4: ...PREFACE 2...
Страница 16: ...CONTENTS 8...
Страница 18: ...1 2...
Страница 19: ...2 1 2 CONTRAINDICATION Any application other than dialysis using SURDIAL is contraindicated...
Страница 20: ...2 2...
Страница 22: ...3 2...
Страница 24: ...4 2...
Страница 25: ...5 FLOW CHART...
Страница 26: ......
Страница 32: ...5 6...
Страница 33: ...6 DISASSEMBLING AND REPLACEMENT...
Страница 34: ......
Страница 40: ...6 1 1 6...
Страница 44: ...6 1 2 4...
Страница 48: ...6 1 3 4...
Страница 50: ...6 1 4 2...
Страница 54: ...6 1 6 2...
Страница 56: ...6 2 1 2...
Страница 60: ...6 2 2 4...
Страница 64: ...6 2 3 4...
Страница 66: ...6 2 4 2...
Страница 72: ...6 2 5 6...
Страница 73: ...6 2 6 1 6 2 6 Blood pump Assy BP BPC Fig 6 2 6 1 Blood pump Assy...
Страница 76: ...6 2 6 4...
Страница 77: ...6 2 7 1 6 2 7 Gear pump Assy P1 P2 6 2 7 1 TYPE I Micro gear pump Fig 6 2 7 1 Micro gear pump Assy TYPE I...
Страница 79: ...6 2 7 3 6 2 7 2 TYPE II Magnet gear pump Normal Type Fig 6 2 7 2 Magnet gear pump Assy TYPE II Normal Type...
Страница 81: ...6 2 7 5 6 2 7 3 TYPE II Magnet gear pump A Type Fig 6 2 7 3 Magnet gear pump Assy TYPE II A Type...
Страница 84: ...6 2 7 8...
Страница 85: ...6 2 8 1 6 2 8 Venous clamp Assy CLV Fig 6 2 8 1 Venous clamp Assy...
Страница 87: ...6 2 9 1 6 2 9 Syringe pump Assy SP Fig 6 2 9 1 Syringe pump Assy...
Страница 92: ...6 3 2 2...
Страница 94: ...6 3 3 2...
Страница 96: ...6 3 4 2...
Страница 100: ...6 3 5 4...
Страница 106: ...6 3 7 4...
Страница 114: ...6 3 10 2...
Страница 115: ...6 3 11 1 6 3 11 Chamber Assy VCa VCb 6 3 11 1 Chamber Assy Overall Fig 6 3 11 1 Chamber Assy Overall Chamber...
Страница 117: ...6 3 11 3 6 3 11 2 Chamber Assy Viscous chamber Fig 6 3 11 2 Chamber Assy Viscous chamber Cross section A A...
Страница 132: ...6 3 16 2...
Страница 133: ...7 CONSTRUCTION OF ELECTRICAL PART...
Страница 134: ......
Страница 141: ...8 CONNECTION REPLACEMENT AND ADJUSTMENT...
Страница 142: ......
Страница 186: ...8 12 8...
Страница 195: ...9 MAINTENANCE MODES...
Страница 196: ......
Страница 198: ...9 1 2...
Страница 204: ...9 3 2...
Страница 220: ...9 9 6...
Страница 230: ...9 12 2...
Страница 232: ...9 13 2...
Страница 234: ......
Страница 246: ...10 3 6...
Страница 262: ...10 8 2...
Страница 264: ...10 9 2...
Страница 268: ...10 10 4...
Страница 270: ...10 11 2...
Страница 280: ...10 15 4...
Страница 290: ...10 17 2...
Страница 292: ...10 18 2...
Страница 298: ...10 21 2...
Страница 300: ...10 22 2...
Страница 303: ...11 DIP SWITCHES...
Страница 304: ......
Страница 306: ...11 1 2...
Страница 312: ...11 2 6...
Страница 313: ...12 VARIOUS DATA...
Страница 314: ......
Страница 316: ...12 1 2...
Страница 334: ...12 3 12...