2. Preparation before Use
PROGRAMMABLE AC/DC POWER SOURCE
18
2.7
Simple Operation Check
This section describes how to perform a simple operation check when you purchased a new product,
or after storing the product for a long period. This check should be performed without load. If you
are not satisfied with the results verified at the operation check, please request the repair to us or our
agent.
Operation procedure
1.
Connect the power supply referring to "
2.4 Grounding and Power Connections
."
2.
Attach the resin-molded output terminal cover and the output cable holder without connecting
anything to the output terminals or any other terminal/connector.
OUTPUT
Hi
Lo
Nothing is connected to
the output terminal.
Содержание KP3000GS
Страница 1: ...PROGRAMMABLE AC DC POWER SOURCE KP3000GS INSTRUCTION MANUAL...
Страница 2: ......
Страница 3: ...DA00033845 005 PROGRAMMABLE AC DC POWER SOURCE KP3000GS INSTRUCTION MANUAL...
Страница 4: ......
Страница 5: ......
Страница 19: ......
Страница 20: ...KP3000GS 1 1 Outline 1 1 Overview 2 1 2 Features 2...
Страница 23: ......
Страница 197: ......
Страница 198: ...KP3000GS 179 5 Description of Screen and Menu 5 1 Screen Configuration 180 5 2 Menu Composition 184...
Страница 207: ......
Страница 208: ...KP3000GS 189 6 Remote Control 6 1 Communication Interface 190 6 2 Remote Local State Switching 199...
Страница 219: ......
Страница 224: ...KP3000GS 205 8 Troubleshooting 8 1 Error Messages and Error Handling 206 8 2 When a Failure is Suspected 213...
Страница 243: ......
Страница 275: ......
Страница 277: ......
Страница 278: ......
Страница 279: ...http www nfcorp co jp NF Corporation 6 3 20 Tsunashima Higashi Kohoku ku Yokohama 223 8508 JAPAN...