4. Advanced Operation
PROGRAMMABLE AC/DC POWER SOURCE
100
--------
Notes
------------------------------------------------------------------------------------------------------------
If an improper setting is detected during compilation, an error message is displayed and the
screen does not transition to the Simulation Control View.
-----------------------------------------------------------------------------------------------------------------------------
Starting/ending a simulation
1.
If output is turned off in the Simulation Edit View, the Power Fluctuation Test can be executed
when output is turned on in the Simulation Control View. At this point, the output is in the state
set in the Initial Step. When a simulation is stopped, the
icon is displayed.
2.
Press the [Start] soft-key to start the simulation. While the simulation is executed, icon
is displayed.
Содержание KP3000GS
Страница 1: ...PROGRAMMABLE AC DC POWER SOURCE KP3000GS INSTRUCTION MANUAL...
Страница 2: ......
Страница 3: ...DA00033845 005 PROGRAMMABLE AC DC POWER SOURCE KP3000GS INSTRUCTION MANUAL...
Страница 4: ......
Страница 5: ......
Страница 19: ......
Страница 20: ...KP3000GS 1 1 Outline 1 1 Overview 2 1 2 Features 2...
Страница 23: ......
Страница 197: ......
Страница 198: ...KP3000GS 179 5 Description of Screen and Menu 5 1 Screen Configuration 180 5 2 Menu Composition 184...
Страница 207: ......
Страница 208: ...KP3000GS 189 6 Remote Control 6 1 Communication Interface 190 6 2 Remote Local State Switching 199...
Страница 219: ......
Страница 224: ...KP3000GS 205 8 Troubleshooting 8 1 Error Messages and Error Handling 206 8 2 When a Failure is Suspected 213...
Страница 243: ......
Страница 275: ......
Страница 277: ......
Страница 278: ......
Страница 279: ...http www nfcorp co jp NF Corporation 6 3 20 Tsunashima Higashi Kohoku ku Yokohama 223 8508 JAPAN...