![Neptune Systems AquaController Apex Classic Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/neptune-systems/aquacontroller-apex-classic/aquacontroller-apex-classic_setup-and-programming-manual_1668298011.webp)
Apex Classic Setup and Programming Guide v2.2
Page
6
Whichever interface you use for setup, you can be up and running with a basic
AquaController Apex configuration in as little as 15 minutes. However, to take full
advantage of the advanced programming features may take additional time and
you may find yourself adding functions and enabling features every few days until
you get it customized just the way you like it. Don’t be afraid to ask for help from
the very active user community in Neptune System’s sponsor forum on
ReefCentral.com, it is a great source for programming examples.
PHYSICAL INSTALLATION
The Apex Base Module, EnergyBar 8 and Apex display should be securely
mounted in a location free from moisture. Use wood screws through the
mounting tabs of the EnergyBar 8 and Apex Base Module or if mounting on
drywall, use drywall anchors (anchors not included). The Apex Display can be
mounted using the keyhole slots on the back of the display or with strong Velcro.
•
Mount all modules above the water line of the aquarium.
•
Be sure to utilize drip loops on all power cords, AquaBus cables and probe
cables.
•
Plug the EnergyBar 8 into a circuit protected by a Ground Fault Circuit
Interrupter (GFCI).
WARNING: Water damage will void your warranty! Mount all modules in
locations safe from moisture exposure.
BASE SYSTEM INITIAL CONNECTIONS
Refer to Figure 2 - Apex Base Module Connections and Figure 3 - Apex Lite Base
Module Connections for the connection locations.
Figure 2 - Apex Base Module Connections
Figure 3 - Apex Lite Base Module Connections