D-24
4. Installing Unit on Sun StorEdge Rack
NOTE:
To install the unit on the Sun StorEdge rack, the
NF9100-SK02E rack-mount kit is to be separately purchased.
Ask your sales representative for details.
4.1 Installation of Rails
1.
Temporarily tighten two set screws (#10-32UNF) at both ends of the front frame that
corresponds to the unit installation location. (Do not tighten the screws firmly.)
Set screw
Содержание S1400 NF1400-SR40E
Страница 8: ...vii ...
Страница 9: ...viii ...
Страница 10: ...ix ...
Страница 105: ...8 21 Manufacturing number label of power supply Manufacturing number label of battery backup unit ...