Upgrading Your Server 9-31
Hot Add
Take the following procedure to execute Hot Add:
1.
Pull out the server from the rack with the power being on.
2.
Remove the top cover.
3.
Locate the slot in which you are going to install an additional board.
NOTE:
Confirm that the PCI Slot Power LED of the slot in which you
are going to install the PCI board is off.
4.
Open the protect plate.
5.
Push the tab at the tip of the additional slot cover of the slot in which you are going to
install the PCI board to unlock the tab. Open the tab.
IMPORTANT:
Do not open the retention tab to 90 degrees or more.
Doing so could damage the tab.
Содержание Express5800/140Rf-4
Страница 7: ......
Страница 8: ......
Страница 9: ......
Страница 20: ...x This page is intentionally left blank ...
Страница 152: ...4 54 Configuring Your Server The detailed settings is continued to the next page Click Next to view more information ...
Страница 163: ...Configuring Your Server 4 65 Use this menu to define several physical drives PD as a disk group DG ...
Страница 186: ...4 88 Configuring Your Server 3 Setting menu for VD 0 is displayed ...
Страница 194: ...4 96 Configuring Your Server This page is intentionally left blank ...
Страница 226: ...5 32 Installing the Operating System with Express Setup This page is intentionally left blank ...
Страница 235: ...Installing and Using Utilities 6 9 4 Click Parameter File Creator Parameter File Creator will appear ...
Страница 264: ...7 18 Maintenance This page is intentionally left blank ...
Страница 397: ...9 64 Upgrading Your Server 6 Remove the CPU protect cover 7 Remove the dummy cover from the socket ...
Страница 413: ...C 4 This page is intentionally left blank ...
Страница 457: ...E 22 Installing Windows Server 2003 This page is intentionally left blank ...