2-24 General Description
POWER/SLEEP Switch
Use the POWER/SLEEP switch to turn on/off the server.
Power On
Press the POWER/SLEEP switch on the front of the computer chassis.
The POWER/SLEEP LED lights in green.
POWER/SLEEP LED
POWER/SLEEP switch
IMPORTANT:
If the power cord is connected to a power control device such as a
UPS (Uninterruptive Power Supply), make sure that the power
control device is powered.
If the power cord is connected to the server, an initial diagnosis of
the hardware starts. The POWER/SLEEP switch does not work
while in diagnosis. Wait for about 30 seconds, then press the
POWER/SLEEP switch.
Do not turn off the server until characters following the "NEC" logo
appear on the screen. The time until the characters appear depends
on your system configuration. Approximately, it may take three to
five minutes.
Содержание Express5800/140Rf-4
Страница 7: ......
Страница 8: ......
Страница 9: ......
Страница 20: ...x This page is intentionally left blank ...
Страница 152: ...4 54 Configuring Your Server The detailed settings is continued to the next page Click Next to view more information ...
Страница 163: ...Configuring Your Server 4 65 Use this menu to define several physical drives PD as a disk group DG ...
Страница 186: ...4 88 Configuring Your Server 3 Setting menu for VD 0 is displayed ...
Страница 194: ...4 96 Configuring Your Server This page is intentionally left blank ...
Страница 226: ...5 32 Installing the Operating System with Express Setup This page is intentionally left blank ...
Страница 235: ...Installing and Using Utilities 6 9 4 Click Parameter File Creator Parameter File Creator will appear ...
Страница 264: ...7 18 Maintenance This page is intentionally left blank ...
Страница 397: ...9 64 Upgrading Your Server 6 Remove the CPU protect cover 7 Remove the dummy cover from the socket ...
Страница 413: ...C 4 This page is intentionally left blank ...
Страница 457: ...E 22 Installing Windows Server 2003 This page is intentionally left blank ...