3-14 Setting Up Your Server
NOTE:
When installing the server into NEC rack, fix the arm stopper
to the slide rail assembly with screw (B).
Viewed from inside
Push the arm stopper in the direction shown
by arrow mark so that the folded portion hits
the end, then fix it with the screw.
Arm stopper
9.
Push the server into the rack once to check the installation position.
To push the server into the rack, lift green release levers at both sides of the rail to unlatch
the server. Pay strict attention to your fingers not to be caught.
IMPORTANT:
Push each release lever using a screwdriver or a similar tool.
Pushing a release lever with your fingers may cause the fingers to
be caught and thus injured.
Two release levers are provided on each side of the rail. Be sure to
use green levers only.
Release lever
Содержание Express5800/140Rf-4
Страница 7: ......
Страница 8: ......
Страница 9: ......
Страница 20: ...x This page is intentionally left blank ...
Страница 152: ...4 54 Configuring Your Server The detailed settings is continued to the next page Click Next to view more information ...
Страница 163: ...Configuring Your Server 4 65 Use this menu to define several physical drives PD as a disk group DG ...
Страница 186: ...4 88 Configuring Your Server 3 Setting menu for VD 0 is displayed ...
Страница 194: ...4 96 Configuring Your Server This page is intentionally left blank ...
Страница 226: ...5 32 Installing the Operating System with Express Setup This page is intentionally left blank ...
Страница 235: ...Installing and Using Utilities 6 9 4 Click Parameter File Creator Parameter File Creator will appear ...
Страница 264: ...7 18 Maintenance This page is intentionally left blank ...
Страница 397: ...9 64 Upgrading Your Server 6 Remove the CPU protect cover 7 Remove the dummy cover from the socket ...
Страница 413: ...C 4 This page is intentionally left blank ...
Страница 457: ...E 22 Installing Windows Server 2003 This page is intentionally left blank ...