© MOOG 2010
This document is subject to MOOG INTELLECTUAL AND PROPRIETARY INFORMATION LEGEND . The details are on page II.
39
MRJ04410
Figure 1-42 Accumulator
Setup
1-7-8.
ACCUMULATOR MACHINE SETUP
Setting up an Accumulator blow molding machine is very
similar to the set up procedure for a Continuous blow
molding machine. The only difference is the Accumulator
position transducer calibration.
To enter the Setup Mode, press and hold F1 Profile and
press Set. Then move to ACCUM. The Setup screen will
appear as shown in “
Figure 1-42
”.
The set up procedures for the DCDT / SSI, Zero, Span Core
Stroke, and Gain etc. are the same as for a Continuous blow
molding machine and must be completed before the accu-
mulator can be set up.
After completing the initial tooling set up, press SET and the
screen shown in “
Figure 1-43
” appears.
EMPTY_________________
The accumulator is now moved, using the blow molding
machine controls, to its fully Empty position, where it should
be totally empty of plastic using the following procedure:
1)
“Start” signal is activated
2)
The die gap tooling moves to 50% open
3)
Adjust the tooling opening if necessary
4)
Move the accumulator to its empty position
5)
Push SET at the Empty position, the DigiPack
Ⅱwill store the Empty position and turn on
the “End of Extrusion” LED on. The Setup
screen will now display Full “
Figure 1-44
”
Figure 1-43 EMPTY Accumulator Set Up