Chapter Three: Installation and Configuration
Installation Procedure
32
Mounting Hardware
P9B MFCs with in-line fittings (VCR) have four threaded mounting holes located on the bottom or base of
the unit: two #8-32 and two M4. Depending on the hole pattern chosen, use #8-32 UNC-2B or M4 hardware
to mount the instrument. The figures on the previous pages show the location and dimensions of the mounting
holes for standard axial fittings.
The P9B MFC’s C-Seal and W-Seal downmount fittings are designed for device mounting using four M5-0.8
x 30 mm long socket head cap screws. In addition, C-Seal units may be mounted using 10-32 UNF x 1.25”
long socket head cap screws if your mounting substrate requires.
Control Valve – Not a Shut-off Valve
The control valve is
not
a positive shutoff valve. Some leakage across the valve may occur. Refer to
Appendix A,
Product Specifications,
page 91, for the leak integrity specifications. If necessary, install a
separate positive shutoff valve in your system.
Note
Connect the MFC to your system so that the gas flows in the direction of the flow arrow on the
front of the unit.
Installation Procedure
Install the MFC
Note
DO NOT make any electrical connections to the MFC until directed to do so.
Note
Information on electrical connections (pinouts and settings) is found in Chapter 4.
1. The MFC is prepared for cleanroom installation.
Follow standard cleanroom practices to ensure a clean installation:
- discard outer material outside of the cleanroom
- remove the outer packaging in the gray area
-
carry the MFC into the clean area then remove the inner bag and any protective fitting covers just prior
to installation. Remove plastic ethernet kit from inner plastic and DO NOT take them into clean room.
-
Do not discard calibration sheet
Содержание P9B
Страница 1: ...1042936 001 Rev A January 2013 MKS Type P9B Digital Mass Flow Controller Instruction Manual...
Страница 4: ......
Страница 10: ...List of References vi This page intentionally left blank...
Страница 20: ......
Страница 22: ...12...
Страница 23: ...13 MKS Instruments Inc MKS Calibration and Service Center...
Страница 24: ...14...
Страница 26: ...16 MKS Instruments Inc MKS MKS Calibration and Service Center...
Страница 27: ...17...
Страница 28: ...18...
Страница 32: ......
Страница 56: ...Chapter Four Analog and Digital Interface Digital Interface Input and Output Options 46...
Страница 64: ......
Страница 68: ...Chapter Five Ethernet Interface Setup and Configuration Digital Interface Input and Output Options 58...
Страница 86: ...Chapter Six Embedded Web Based GUI and Diagnostics Tuning the MFC for Optional PC 76...
Страница 92: ...Chapter Seven Maintenance Pressure Zero Adjustment 82 This page intentionally left blank...
Страница 99: ...Troubleshooting Chart Chapter Eight Troubleshooting 89 This page intentionally left blank...
Страница 100: ......
Страница 105: ...Appendix A Product Specifications Electrical Specifications 95...
Страница 111: ...Model Code Description 101...
Страница 112: ...Model Code Description Appendix C Health and Safety Form 102 Appendix C Health and Safety Form...