
Chapter Three: Installation and Configuration
Unpacking
26
Chapter Three: Installation and Configuration
Unpacking
MKS has carefully packed your device so that it will reach you in perfect operating order. Upon receiving the
unit, however, you should check for defects, cracks, broken connectors, etc., to be certain that damage has not
occurred during shipment.
Note
Do
not
discard any packing materials until you have completed your inspection and are sure the
unit arrived safely.
If you find any damage, notify your carrier and MKS immediately. If it is necessary to return the unit to
MKS, obtain an RMA Number (Return Material Authorization Number) from the MKS Calibration and
Service Center before shipping. Please refer to the MKS website
http://www.mksinst.com/Service/ServiceHome.aspx
for contact and additional information.
Opening the Package
Each device is assembled, leak tested with helium, and calibrated in a cleanroom environment. The
instrument is double-packaged in this environment to ensure maintenance of its particle free condition during
shipment. It is very important to remove the packaging according to good clean room practices. To maintain
at least a minimal level of clean room standards, follow the instructions below:
1.
Remove all cardboard and packaging materials. Set aside before entering the garmenting room. Do not
discard until the device has been inspected for damage and determined to be in working order.
2.
Remove the outer plastic shipping container in an ante room (garmenting room) or transfer box. Do not
allow this container to enter the clean room.
3.
Remove the inner bag in the clean room.
4.
Inspect for any damage.
5.
Pass the original calibration sheet to the appropriate personnel at your company.
Caution
Only qualified individuals should perform the installation and adjustments of the
MFC. Individuals must comply with all necessary ESD handling precautions while
installing and adjusting the instrument. Proper handling is essential when working
with all highly sensitive precision electronic instruments.
Unpacking Checklist
Standard Equipment:
MFC
Flow calibration sheet
Содержание P9B
Страница 1: ...1042936 001 Rev A January 2013 MKS Type P9B Digital Mass Flow Controller Instruction Manual...
Страница 4: ......
Страница 10: ...List of References vi This page intentionally left blank...
Страница 20: ......
Страница 22: ...12...
Страница 23: ...13 MKS Instruments Inc MKS Calibration and Service Center...
Страница 24: ...14...
Страница 26: ...16 MKS Instruments Inc MKS MKS Calibration and Service Center...
Страница 27: ...17...
Страница 28: ...18...
Страница 32: ......
Страница 56: ...Chapter Four Analog and Digital Interface Digital Interface Input and Output Options 46...
Страница 64: ......
Страница 68: ...Chapter Five Ethernet Interface Setup and Configuration Digital Interface Input and Output Options 58...
Страница 86: ...Chapter Six Embedded Web Based GUI and Diagnostics Tuning the MFC for Optional PC 76...
Страница 92: ...Chapter Seven Maintenance Pressure Zero Adjustment 82 This page intentionally left blank...
Страница 99: ...Troubleshooting Chart Chapter Eight Troubleshooting 89 This page intentionally left blank...
Страница 100: ......
Страница 105: ...Appendix A Product Specifications Electrical Specifications 95...
Страница 111: ...Model Code Description 101...
Страница 112: ...Model Code Description Appendix C Health and Safety Form 102 Appendix C Health and Safety Form...