15
15-33
Inspection procedure
Inspection: Air-tightness of power chamber
•
Connect the components with piping as illustrated. Apply the
specified inspection vacuum or higher to the power chamber
and stop the vacuum pump.
•
Fifteen seconds later, the reading on the vacuum gauge should
conform to the standard value.
•
If not, replace the power chamber.
Adjustment after installation
Adjustment: Clevis
•
Assemble the power chamber onto the bracket. Then, adjust the
location of the clevis such that the hole in the clevis is aligned by
half with the hole in the lever.
Adjustment: Butterfly valve
(1) Average of top and bottom clearance between butterfly
valve and body with valve fully closed.
•
Apply a vacuum of 87 to 93 kPa {650 to 700 mmHg} to the pow-
er chamber to fully close the butterfly valve. With the valve fully
closed, measure the top and bottom clearances B and A be-
tween the valve and the body, and obtain the average of the two.
The average value should conform to the standard value. Adjust
with the adjust bolt as required.
Average clearance =
(2) Valve fully-open position
•
Adjust the butterfly valve to the full open position using the ad-
just bolt.
(A + B)
2
Содержание Fuso CANTER FE85DE6SLGP
Страница 8: ...M E M O 00 5 00...
Страница 12: ...00 00 9...
Страница 13: ...00 10 How to Read Circuits Electrical HOW TO READ THIS MANUAL...
Страница 16: ...M E M O 00 13 00...
Страница 41: ...11 11 3 1 Exploded View STRUCTURE AND OPERATION...
Страница 51: ...M E M O 11 13 11...
Страница 59: ...M E M O 11 21 11...
Страница 60: ...11 22 ROCKER COVER...
Страница 67: ...M E M O 11 29 11...
Страница 71: ...M E M O 11 33 11...
Страница 74: ...11 36 CYLINDER HEAD AND VALVE MECHANISM...
Страница 79: ...M E M O 11 41 11...
Страница 95: ...M E M O 11 57 11...
Страница 101: ...M E M O 11 63 11...
Страница 105: ...M E M O 11 67 11...
Страница 109: ...M E M O 11 71 11...
Страница 110: ...11 72 TIMING GEARS AND BALANCE SHAFTS...
Страница 117: ...M E M O 11 79 11...
Страница 140: ...M E M O 12 11 12...
Страница 150: ...M E M O 12 21 12...
Страница 169: ...M E M O 13 15 13...
Страница 173: ...M E M O 13 19 13...
Страница 177: ...M E M O 13 23 13...
Страница 181: ...M E M O 13 27 13...
Страница 182: ...13 28 SUPPLY PUMP...
Страница 185: ...M E M O 13 31 13...
Страница 191: ...13E 4 1 1 Supply pump STRUCTURE AND OPERATION...
Страница 198: ...13E 13E 11 2 Electronic Control System 2 1 System block diagram...
Страница 253: ...M E M O 14 3 14...
Страница 254: ...14 4 1 Cooling System Flow of Coolant STRUCTURE AND OPERATION...
Страница 266: ...14 16 DISCONNECTION AND CONNECTION OF HOSES AND PIPES...
Страница 267: ...14 14 17...
Страница 269: ...M E M O 14 19 14...
Страница 277: ...M E M O 14 27 14...
Страница 296: ...M E M O 15 17 15...
Страница 306: ...M E M O 15 27 15...
Страница 313: ...15 34 FE85DE FE85DG DIESEL PARTICULATE FILTER...
Страница 335: ...MARCH 2015 Shop Manual 4M5 diesel engine For Colombia EURO 4...