M70V Series Connection Manual
4.4 Connection of Remote I/O Unit
135
When connecting to the operation panel I/O unit
Station No. 1, 2, 7, 8 (or 1, 2, 3, 7, 8) are occupied by the operation panel I/O unit. (Station No. 7 and 8 are reserved
for manual pulse generator.)
The maximum numbers of stations and I/O points assigned to remote I/O unit(s) via RIO3 are as follows.
Setting example 1
Number of occupied stations: 1
Total number of occupied stations: 1
Setting example 2
Number of occupied stations: 2 2
Total number of occupied stations: 4 (Maximum configuration)
Operation panel I/O unit type Max. number of stations (RIO3
connection)
Max. number of I/O points
(RIO3 connection)
Remote I/O
Rotary switch
Setting range
FCU7-DX710
4 stations (No. 3 to 6)
128 points/128 points
2 to 5
FCU7-DX711
4 stations (No. 3 to 6)
128 points/128 points
2 to 5
FCU7-DX720/730/721/731
3 stations (No. 4 to 6)
96 points/96 points
3 to 5
㧗
2
FCU7-DX710/711
FCUA-DX100/101
+
4
5
+
2
3
FCU7-DX710/711
FCUA-DX110/111
or
FCUA-DX120/121
FCUA-DX110/111
or
FCUA-DX120/121
Содержание M70V Series
Страница 1: ......
Страница 13: ......
Страница 15: ......
Страница 17: ......
Страница 19: ......
Страница 21: ......
Страница 25: ......
Страница 26: ...1 1 System Configuration ...
Страница 36: ...11 2 General Specifications ...
Страница 110: ...85 3 Installation ...
Страница 120: ...95 4 Connection ...
Страница 173: ...4 Connection MITSUBISHI CNC 148 ...
Страница 174: ...149 付録 Ap 1 章 149 Appendix 1 Cable ...
Страница 220: ...195 付録 Ap 2 章 195 Appendix 2 EMC Installation Guidelines ...
Страница 232: ...207 付録 Ap 3 章 207 Appendix 3 Restrictions for Lithium Batteries ...
Страница 241: ...Appendix 3 Restrictions for Lithium Batteries MITSUBISHI CNC 216 ...
Страница 242: ...217 付録 Ap 4 章 217 Appendix 4 Precautions for Compliance to UL c UL Standards ...
Страница 246: ......
Страница 250: ......