M70V Series Connection Manual
Appendix 2.5 Measures for Wiring in Panel
201
(3) Servo communication cable [SH21 cable]
-
Use a shield clamp within 10cm from the panel's inlet/outlet.
-
When using a ferrite core, install it on both ends of the connected units.
(4) Ethernet cable
-
Use a shielded cable. Use a shield clamp within 10cm from the panel's inlet/outlet.
-
When using a ferrite core, install it on both ends of the connected units.
SH21B
Control panel
cable
Control panel
Control unit
Drive section unit
Shield clamp
Ferrite core
Control panel
Control unit
Shield clamp
Ferrite core
Peripheral device
Ethernet cable
Operation panel
Содержание M70V Series
Страница 1: ......
Страница 13: ......
Страница 15: ......
Страница 17: ......
Страница 19: ......
Страница 21: ......
Страница 25: ......
Страница 26: ...1 1 System Configuration ...
Страница 36: ...11 2 General Specifications ...
Страница 110: ...85 3 Installation ...
Страница 120: ...95 4 Connection ...
Страница 173: ...4 Connection MITSUBISHI CNC 148 ...
Страница 174: ...149 付録 Ap 1 章 149 Appendix 1 Cable ...
Страница 220: ...195 付録 Ap 2 章 195 Appendix 2 EMC Installation Guidelines ...
Страница 232: ...207 付録 Ap 3 章 207 Appendix 3 Restrictions for Lithium Batteries ...
Страница 241: ...Appendix 3 Restrictions for Lithium Batteries MITSUBISHI CNC 216 ...
Страница 242: ...217 付録 Ap 4 章 217 Appendix 4 Precautions for Compliance to UL c UL Standards ...
Страница 246: ......
Страница 250: ......