4 Connection
MITSUBISHI CNC
132
When connecting to the operation panel I/O unit
(Note)
Operation panel I/O unit occupies the specified Nos. of stations. (Station No. 7 and 8 are reserved for
manual pulse generator.)
RIO3 can use either four stations (3rd to 6th) or three stations (4th to 6th) which depends on the
operation panel I/O unit type.
FCU7-DX710/711
FCUA-R211
FCUA-R211
RIO3
RIO3
FCU7-DX720/721
/730/731
G011
G011
CG71
2
5
3
5
FCUA-DX1xx
Control unit
Operation panel I/O unit
Remote I/O 3ch
Max. 4 channels
Max. input: 128 points (X240 to X2BF)
Max. output: 128 points (Y240 to Y2BF)
Max. 3 channels
Max. input: 96 points (X260 to X2BF)
Max. output: 96 points (Y260 to Y2BF)
Remote I/O unit
Station No.3 - 6
Remote I/O 3ch
Max. input: 96 points (X200 to X25F)
Max. output: 96 points (Y200 to Y25F)
Max. input: 64 points (X200 to X23F)
Max. output: 64 points (Y200 to Y23F)
Station No.4 - 6
Occupies
the station No. 1, 2, 7, 8
Occupies
the station No. 1, 2, 3, 7, 8
Содержание M70V Series
Страница 1: ......
Страница 13: ......
Страница 15: ......
Страница 17: ......
Страница 19: ......
Страница 21: ......
Страница 25: ......
Страница 26: ...1 1 System Configuration ...
Страница 36: ...11 2 General Specifications ...
Страница 110: ...85 3 Installation ...
Страница 120: ...95 4 Connection ...
Страница 173: ...4 Connection MITSUBISHI CNC 148 ...
Страница 174: ...149 付録 Ap 1 章 149 Appendix 1 Cable ...
Страница 220: ...195 付録 Ap 2 章 195 Appendix 2 EMC Installation Guidelines ...
Страница 232: ...207 付録 Ap 3 章 207 Appendix 3 Restrictions for Lithium Batteries ...
Страница 241: ...Appendix 3 Restrictions for Lithium Batteries MITSUBISHI CNC 216 ...
Страница 242: ...217 付録 Ap 4 章 217 Appendix 4 Precautions for Compliance to UL c UL Standards ...
Страница 246: ......
Страница 250: ......