Appendix 2 EMC Installation Guidelines
MITSUBISHI CNC
200
Appendix 2.5.2 Shield Treatment of Cables
Use shielded cables for the cables wired outside the panel.
Use a shield clamp within 10cm of the lead-out port from the panel. (Refer to "EMC Countermeasure Parts: Shield
Clamp Fitting".)
(1) DC power supply cable [F110/F070 cable]
-
Use a shield clamp within 10cm from the panel's inlet/outlet.
-
When using a ferrite core, install it on both ends of the connected units.
-
Always install a ferrite core (Refer to "EMC Countermeasure Parts: Ferrite Core".) on the general-purpose
stabilized power supply. The ferrite core may not be required depending on the selected power supply.
(2) Remote I/O cable [FCUA-R211 cable]
-
Use a shield clamp within 10cm from the panel's inlet/outlet.
-
When using a ferrite core, install it on both ends of the connected units.
PD25
Operation panel
Control panel
Display unit
F110 cable
Shield clamp
General-purpose
stabilized power supply
F070 cable
Ferrite core
Operation panel
I/O unit
Control panel
Control panel
Control unit
Shield clamp
Ferrite core
Remote I/O unit
FCUA-R211 cable
Содержание M70V Series
Страница 1: ......
Страница 13: ......
Страница 15: ......
Страница 17: ......
Страница 19: ......
Страница 21: ......
Страница 25: ......
Страница 26: ...1 1 System Configuration ...
Страница 36: ...11 2 General Specifications ...
Страница 110: ...85 3 Installation ...
Страница 120: ...95 4 Connection ...
Страница 173: ...4 Connection MITSUBISHI CNC 148 ...
Страница 174: ...149 付録 Ap 1 章 149 Appendix 1 Cable ...
Страница 220: ...195 付録 Ap 2 章 195 Appendix 2 EMC Installation Guidelines ...
Страница 232: ...207 付録 Ap 3 章 207 Appendix 3 Restrictions for Lithium Batteries ...
Страница 241: ...Appendix 3 Restrictions for Lithium Batteries MITSUBISHI CNC 216 ...
Страница 242: ...217 付録 Ap 4 章 217 Appendix 4 Precautions for Compliance to UL c UL Standards ...
Страница 246: ......
Страница 250: ......