© 2014 MIMAKI ENGINEERING CO.,LTD.
6.2.4
P.1
1
2
3
4
5
6
7
8
6.2.4 Selective Path Pump Assy
Work procedures
1. Remove the
Under cover R, Cover R
and
Cover R2
.
2. Remove the
tubes
from the
Cap1
and
Cap2
, remove the
Fit-
ting
connected to the
pump
tube.
3. Remove the pump
tube
connected to the waste ink tank.
4. Remove the
connector
.
Turn the main power OFF when turning the power OFF. It is very dangerous if sleep mode functions
mistakenly during the operation.
Be sure to wear protective glasses and working gloves during the operation.
Ink may get into your eyes depending on the working condition, or hand skin may get rough if you touch
the ink.
Selective path Assy
Cap1 and 2 side
Take care not to pollute the surroundings with waste
ink or washing liquid.
Connector
Remove tube
Take care not to pollute the surroundings with waste
ink or washing liquid.
R.1.0
MAINTENANCE MANUAL > Disassembly and Reassembly > Ink-related Parts > Selective Path Pump Assy
Model
JV300-130/160
Issued 2014.05.30 Revised
F/W ver
1.00
Remark
1.0
Rev.